Step 1: Excavation process
Start of excavation process to clear and prepare the area.
Step 2: Compaction
Area excavated out and compacted.
Step 3: Road base layer
Road base going in at a depth of 100mm.
Step 4: Forming a level and hard base
Road base needs to be leveled out and compacted.
Step 5: After Compacting
After the road base is compacted it’s ready to bake out.
Step 6: Binding
Anionic emulsion sprayed down to bind new asphalt to road base.
Completed surface
Emulsion sprayed on the surface and sand leveled over to stop water penetration.